Many of the elective spaces also got a new face lift. The existing wood shop was left abandoned after the high school moved out. Existing equiment from the closed middle school was moved into the exitsing space. A new dust collecting system was added as well as renovations to existing stairs and guardrails to bring them up to code. Lighting was upgraded.
Many of the elective spaces also got a new face lift. The existing wood shop was left abandoned after the high school moved out. Existing equiment from the closed middle school was moved into the exitsing space. A new dust collecting system was added as well as renovations to existing stairs and guardrails to bring them up to code. Lighting was upgraded.
Share post:
(970) 766-1470 tab@vail.net